Summary 2:-
The Masdar Project
Abu Dhabi is planning to build a wind farm near to Saudi
Arabia, but the problem is that the Gulf is not a windy area. The turbine
makers are designing an advanced blade to generate more energy and they have to
be done with their project after nine years because “The Government announced
the 7 percent base by 2020“ ( Dr Olaf
Goebel).
Also, Mubadala is developing already two of
its commercial –sized which being built, they are Shams1 and Nour1 the solar
projects.
“The plant, which is still
at the early stages of assessment, would produce 100mw” (Yee, 2011).
The plant would begin
sending power to the grid after two years later. The wind power is more
challenging to develop in the GCC than the solar energy, and in the UAE is
limited because the nature of the wind. The proposed plant will take at least
$200m to be build, according to Masdar’s estimates, and it will require a
similar subsidy to move forward.
Bibliography
citation:
References
Yee,
A. (2011, April 27). Masdar plan for $200m pioneering wind farm - The National.
Latest and breaking news | thenational.ae - The National. Retrieved
March 8, 2012, from
http://www.thenational.ae/business/energy/masdar-plan-for-200m-pioneering-wind-farm
APA
formatting by BibMe.org.
No comments:
Post a Comment